Wednesday, November 8, 2023 / Categories: Mansfield Job Sites Lift Station Rebuild This is a lift station rebuild we did this week. The old plumbing was corroded and causing the check valves to stick. Once we continued to trouble shoot the system it was discovered that the pumps had been wired incorrectly upon original installation. They worked, however the pumps had improper voltage feeding half of the pump’s motors. This was causing them to fail prematurely. Everything was replaced, replumbed, and rewired properly. A little knowledge and work go a long way to ensure the longevity of any mechanical system. This is why we do our own mechanical and electrical in house. Water & Sewer Line Replacement Cast Iron Pipe Replacement Print 1058
Water & Sewer Line Replacement Friday, November 3, 2023 Water & Sewer Line Replacement Friday, November 3, 2023 0 903 Water & Sewer Line Replacement Water and sewer line replacement in Wesleyville we just did recently. The pipe completely collapsed. We also replaced the water line from the curb box to the home. Back up and running.
Erie Wastewater Treatment Plant Wednesday, October 25, 2023 Erie Wastewater Treatment Plant Wednesday, October 25, 2023 0 975 Erie Wastewater Treatment Plant Little work for the city of Erie wastewater treatment plant yesterday. Heavy grit is hard to move without the right equipment...
Hydro-excavating Monday, October 23, 2023 Hydro-excavating Monday, October 23, 2023 0 959 Hydro-excavating Wanted to show another service that we offer. This is hydro-excavating. We use high pressure water and vacuum to dig around utilities or to locate utilities...
Cure in Place Pipelining Wednesday, October 18, 2023 Cure in Place Pipelining Wednesday, October 18, 2023 0 998 Cure in Place Pipelining It’s hard to explain cure in place pipelining. It’s equally hard to get good pictures to help. That being said, here is an example. This existing sewer line is cast - iron. Cast iron eventually corrodes shut or away...