Wednesday, November 8, 2023 / Categories: Mansfield Job Sites Lift Station Rebuild This is a lift station rebuild we did this week. The old plumbing was corroded and causing the check valves to stick. Once we continued to trouble shoot the system it was discovered that the pumps had been wired incorrectly upon original installation. They worked, however the pumps had improper voltage feeding half of the pump’s motors. This was causing them to fail prematurely. Everything was replaced, replumbed, and rewired properly. A little knowledge and work go a long way to ensure the longevity of any mechanical system. This is why we do our own mechanical and electrical in house. Water & Sewer Line Replacement Cast Iron Pipe Replacement Print 665
Rebuilding Sand Filter & Pipe Grid Friday, May 17, 2024 Rebuilding Sand Filter & Pipe Grid Friday, May 17, 2024 0 378 Rebuilding Sand Filter & Pipe Grid Had a customer with recirculating sand filter that was having issues.
Rerouting a Sewer Line Monday, May 6, 2024 Rerouting a Sewer Line Monday, May 6, 2024 0 335 Rerouting a Sewer Line Had to reroute a sewer line at this home.
Replacing Old Cast-iron Pipes Wednesday, May 1, 2024 Replacing Old Cast-iron Pipes Wednesday, May 1, 2024 0 334 Replacing Old Cast-iron Pipes The existing sewer lines were old cast-iron. The cast iron had rotted away and collapsed underneath the foundation.
Electrical and Water Lines Wednesday, April 3, 2024 Electrical and Water Lines Wednesday, April 3, 2024 0 511 Electrical and Water Lines We installed electrical and water lines to a newly built barn.
Before and After Wednesday, March 20, 2024 Before and After Wednesday, March 20, 2024 0 485 Before and After A little before and after visuals.