Wednesday, November 8, 2023 / Categories: Mansfield Job Sites Lift Station Rebuild This is a lift station rebuild we did this week. The old plumbing was corroded and causing the check valves to stick. Once we continued to trouble shoot the system it was discovered that the pumps had been wired incorrectly upon original installation. They worked, however the pumps had improper voltage feeding half of the pump’s motors. This was causing them to fail prematurely. Everything was replaced, replumbed, and rewired properly. A little knowledge and work go a long way to ensure the longevity of any mechanical system. This is why we do our own mechanical and electrical in house. Water & Sewer Line Replacement Cast Iron Pipe Replacement Print 1794
Replaced Catch Basin Wednesday, June 11, 2025 Replaced Catch Basin Wednesday, June 11, 2025 0 200 Replaced Catch Basin Catch basin replaced at a local American Legion
Tank Replacement Friday, June 6, 2025 Tank Replacement Friday, June 6, 2025 0 168 Tank Replacement Tank replacement in Corry!
Septic Tank Installation Monday, April 7, 2025 Septic Tank Installation Monday, April 7, 2025 0 840 Septic Tank Installation Check it out!
Drain Repair Wednesday, March 19, 2025 Drain Repair Wednesday, March 19, 2025 0 900 Drain Repair We finished a drain repair at an Auto Zone down in Waynesburg, PA.
Complete Replumbing Friday, March 14, 2025 Complete Replumbing Friday, March 14, 2025 0 1010 Complete Replumbing A complete replumbing at the Edinboro Mall.